SummitCove would like to remind Owners and Guest of the Pines of a repair to the boiler ventilation system and required fire panel testing in several Pines buildings prior to Opening Day of Winter Season at Keystone.
- Fire panel testing will take place beginning on Wednesday October 26-Friday October 28th. Fire alarms will go off during normal business hours on these days.
- A cold water supply will remain available, however hot water will be limited to what is available in storage tanks. The pool and building shower will be available without disruption.
The maintenance schedule is as follows:
Building 2 (Foxtail): Wednesday, November 2nd to Thursday, November 3, 2011.
Building 5 (Longleaf): Saturday, October 29th to Sunday, October 30, 2011
Building 6 (Mountain): Thursday, October 27th to Friday, October 28, 2011
SummitCove has closed reservations for those Pines properties that will be affected. Please contact us with any questions that you may have. Thank you for your patience as these necessary repairs are made!