Posted on 10/23/2011 by Alyssa Schnarsky

Pines Maintenance Announcement

SummitCove would like to remind Owners and Guest of the Pines of a repair to the boiler ventilation system and required fire panel testing in several Pines buildings prior to Opening Day of Winter Season at Keystone.

  • Fire panel testing will take place beginning on Wednesday October 26-Friday October 28th.  Fire alarms will go off during normal business hours on these days.
  • A cold water supply will remain available, however hot water will be limited to what is available in storage tanks.  The pool and building shower will be available without disruption.

The maintenance schedule is as follows:

Building 2 (Foxtail): Wednesday, November 2nd to Thursday, November 3, 2011.

Building 5 (Longleaf): Saturday, October 29th to Sunday, October 30, 2011

Building 6 (Mountain):  Thursday, October 27th to Friday, October 28, 2011

SummitCove has closed reservations for those Pines properties that will be affected.  Please contact us with any questions that you may have. Thank you for your patience as these necessary repairs are made!

 



About The Author
Alyssa Schnarsky

Alyssa Schnarsky is the Marketing Director at SummitCove Vacation Lodging in Keystone and has worked in the vacation lodging industry for over 15 years. When she's not delivering exceptional content on all-things Keystone, you can find her hiking in the mountains, skiing the trees, enjoying a live concert, spending time with her tuxedo cat or planning her next adventure.

Previous Buffalo Lodge Studio Joins SummitCove Just in Time for Winter! Soda Springs 3 Bedroom in West Keystone Joins SummitCove! Next